Search
导航菜单
GUIDE
PP hollow plastic construction formwork
parameters1:Size:1830*915*15/14mm
parameters2:The times of reuse: 50 times
parameters3:Raw material: PP

 

 

 

 

Waterproof concrete formwork

Introduction Vedio
Product Overviews
>

The concrete formwork produced by BEIZHU uses imported polypropylene resin as basic material, adding chemical additives toughening, flame resistance, weather resistance and anti-aging, smelt and form new construction material through chemical molecular structure reorganization.

Product Features

 

plastic formwork Match plastic formworkformwork system steel lattice girder beam folding scaffolding system aluminum pipe ladder from

 Match formwork system steel lattice girder beam folding scaffolding system aluminum pipe ladder from factory

1. Light weight, high strength, high hardness, impact resistance, wear resistance.

2. Surface is smooth, bright and clean; Concreting and forming effect is good for steel lattice girder beam.

3. No absorption of moisture, no deformation, no mildew; Long-term immersion stratification in the water, no bubbles, sheet size stability, especially suitable for underground and damp environment.

4. Good toughness. aluminum pipe ladder could be used as cambered special-shaped formwork.

5. Acid and alkali resistance, corrosion resistance; aluminum pipe ladder is very suitable for the engineeringapplication in coastal areas, mine, as well as seawall. steel lattice girder beam needs not do any preservative treatment both in using and storing the formwork, which do not pollute the concrete surface.

6. The reusable time for steel lattice girder beam can reach more than 60 times, long service life.

7. Waste products can be recycled and reprocessed, making full use of waste materials. This property can greatly reduce the project cost compared with wooden formwork and bamboo formwork.

8. Environmental protection and energy saving, no pollution. No any poisonous or harmful gas.

9. Demould easily. No need brushing release agent, only tapping, the folding scaffolding system will fall off. Shorten working hours and speed up the construction schedule efficiently.

10. Easy to process. Sawing, drilling and nailing are all available. aluminum pipe ladder can be combined vertically and horizontally optionally.

11. Easy to remove. Removing is convenient, quick and safe, and the supporting is also easy to operate, advantageous to the organization construction, effectively improving the construction schedule.

  

formwork advantages

With increasing environmental awareness and the influence of policy, green construction material is more and more popular.

Beizhu concrete formwork is a successful innovation of construction material and has been accepted by many Asian countries. folding scaffolding system can reach more than 60 reusable times and have more excellent performance than traditional plywood: green, energy efficient and economical.

Beizhu concrete formwork has been tested by market and will be a great innovation of construction material.

 

 

Product Project

BEIZHU concrete formwork has been accepted and applied in construction in China, India, Australia,Singapore, England and other countries. We have got the positive feedback from our customers. This new construction material folding scaffolding system will be popular and used widely all over the world.

 

General Operation And Notes Of Instrument For concrete formwork :

  • Method of use as well as wooden formwork,  steel lattice girder beam reinforcement direction with batten direction placed in cross shaped.
  • No need to smear the mold release agent before using folding scaffolding system.
  • When cast-in-place the flat plate, spacing between the keels should be 20 ~ 25 cm, and the spacing between the wall plate and keels hould be 10 ~ 20 cm. BEIZHU aluminum pipe ladder don't need releasing agent.
  • The seam-line between steel lattice girder beam should be taped.
  • The length of nail should not be too long, generally about 30 ~ 35 mm.
  • The strength to drive nailsshould be moderate.
  • When removing the folding scaffolding system, please start from the small part of one end, the support and the plates should be removed at the same time aiming at preventing the template widespread drops, don't let the corner drop on the ground vertically.
  • The aluminum pipe ladder accesses to be mixed used with wood veneer, bamboo veneer and other material plate.
Company Information

BEIZHU GROUP

 

Beizhu Group was founded in 1988, is located in Taiyuan City,which is one of the largest manufacturers of home heating radiators and concrete formworks. Beizhu's Covering area is about 12000 square meters, with more than 1500 employees.

 

The product of Beizhu Group has exported to UK, USA, Russia, Ukraine, Kazakhstan, Korea, Singapore, Thailand, Algeria and so on. Now Beizhu has 2 agents in Russian and Kazakhstan.

 

In 2002 year,Beizhu adopted the Certificate of ISO9001:2008 International Quality Management System. Beizhu Group is a high and new technology enterprise which has it's own R&D department. Beizhu keeps long-term cooperation with all the customers all over the world.

 

BEIZHU GROUP has 30 years Production Experience specializing in construction materials production and research; Beizhu Group has past the certificate of ISO9001:2008 International Quality System in 2015; With excellent R&D team, Beizhu has more than 80 patents; With advanced equipment, Beizhu can provide good product and service.

 

Customer Visit

BEIZHU concrete formwork is popular with the customers both at home and abroad. It caused wide public concern and enjoyed a good reputation at the Canton Fair. BEIZHU aluminum pipe ladder has 17 national patents and own intellectual property rights. There are customers and agents in various countries caming to visit our factory.

 

BEIZHU has agents in Thailand and Singapore for concrete formwork now.

plastic formwork 

FAQ

 

Q: Are you a factory or trading company?

A: Factory.

Q: How can I get the sample?

A:We provide sample free of charge 3-7 work days.

Q: What payment terms do you do?

A: 30% T/T as down payment, the balance paid by T/T before shipment

    or 100% irrevocable L/C At sight.

Q: What is your MOQ for plastic formwork?

A: 500 PCS.

Q: How long is your delivery time?

A: 10-15 work days.

Q: How to pack the product?

A: On pallet and carton or as customers' requirement.

Q: How many quantity can load for one 20/40 container?

A: Depend on the different size of plastic formwork.

waterproof concrete formwork

 


PRODUCTS
PRODUCTS SEARCH
脚注信息
Copyright(C)2009-2012  Company website templates